Opened Fall 2007
Principal: Mr. Shannon Bisgard |
|
for
attendance boundaries click here |
|
 |
|
9/26/07 School
is in session and students are enjoying all the building has to
offer. |
|
 |
|
8/7/07 The
main office is open and taking registrations. |
|
 |
|
6/20/07
Cabinetry is being installed in all classrooms. |
|
 |
|
4/27/07 The multipurpose room
and stage. |
|
 |
|
3/29/07 A
view of the interior. |
|
 |
|
3/13/07
Brickwork continues. |
|
 |
|
2/20/07
Roofing continues from south to north. |
|
 |
|
12/14/06
Roofing continues on the gymnasium. |
|
 |
|
11/29/06
Steel trusses are being installed on the gymnasium roof.
|
|
 |
|
11/21/06
This photo was taken from the east side (back) of the building.
On the right are the music and art rooms. |
|
 |
|
11/2/06 Construction
continues on the exterior wall of the building. |
 |
10/15/06 Concrete blocks are being
laid for the exterior walls of the kitchen.
Photo courtesy of Aspect, Inc. |
|
 |
|
10/02/06 Concrete blocks are
being laid for the exterior walls of the gymnasium. |
|
 |
|
8/23/06 Groundbreaking
ceremony |
|
|