9/26/07 School is in session and students are enjoying all the building has to offer.

8/7/07  The main office is open and taking registrations.

6/20/07  Cabinetry is being installed in all classrooms. 

4/27/07 The multipurpose room and stage.

3/29/07  A view of the interior.

3/13/07  Brickwork continues.

2/20/07  Roofing continues from south to north.

12/14/06  Roofing continues on the gymnasium. 

11/29/06  Steel trusses are being installed on the gymnasium roof. 

11/21/06  This photo was taken from the east side (back) of the building. 
On the right are the music and art rooms. 

11/2/06  Construction continues on the exterior wall of the building. 

10/15/06 Concrete blocks are being laid for the exterior walls of the kitchen.
Photo courtesy of Aspect, Inc. 

10/02/06  Concrete blocks are being laid for the exterior walls of the gymnasium.

8/23/06  Groundbreaking ceremony

 
            