9/26/07
The science labs are complete and fully functional. |
|
 |
|
8/7/07 The
former music rehearsal spaces have been remodeled
classrooms. |
|
 |
|
8/7/07
Updating at "four corners" is almost completely finished. |
|
 |
|
6/20/07
The vocal music room is near completion. |
|
 |
|
5/8/07 The
former guidance and athletic offices have been removed to widen
the "four corners" area. |
|
 |
|
5/8/07
Cafeteria equipment has been placed in the Food Court...aka Gym
"C". |
|
 |
|
3/16/07
Construction in the freshman hallway,
guidance office and Food Court is nearly finished. These areas
are expected to open for student use after spring break.
Featured above is a new classroom. |
|
 |
|
2/23/07
"Gym C" is being remodeled into extra cafeteria space. |
|
 |
|
12/14/06
Above is the entrance to the new counseling office. |
|
 |
|
12/14/06
Sheetrock is being installed in the new freshman hallway.
|
|
 |
|
11/27/06
The concrete brick exterior wall of the MEC is being
constructed. |
|
 |
|
10/25/06
Floor, wall and ceiling coverings have been removed in the ninth
grade area. |
|
 |
|
10/25/06
Forms for footings are being installed behind the auditorium.
|
|
 |
|
10/17/06
Construction has begun on the Steven J. Colton Music Education
Center. |
|
 |
|
10/6/06
Groundbreaking ceremony. |
| |