Home -> construction

We are a learning community working together to develop our students by educating them to confidently meet life's challenges

Grant Wood WebMail

Intranet

 


High School Addition & Renovations

Back

9/26/07  The science labs are complete and fully functional.

8/7/07  The former music rehearsal spaces have been remodeled classrooms.

8/7/07  Updating at "four corners" is almost completely finished.

6/20/07  The vocal music room is near completion. 

5/8/07  The former guidance and athletic offices have been removed to widen the "four corners" area.

5/8/07  Cafeteria equipment has been placed in the Food Court...aka Gym "C". 

3/16/07  Construction in the freshman hallway, guidance office and Food Court is nearly finished.  These areas are expected to open for student use after spring break.  Featured above is a new classroom.

2/23/07  "Gym C" is being remodeled into extra cafeteria space.

12/14/06  Above is the entrance to the new counseling office. 

12/14/06  Sheetrock is being installed in the new freshman hallway. 

11/27/06  The concrete brick exterior wall of the MEC is being constructed. 

10/25/06  Floor, wall and ceiling coverings have been removed in the ninth grade area.

10/25/06  Forms for footings are being installed behind the auditorium. 

10/17/06  Construction has begun on the Steven J. Colton Music Education Center.

10/6/06 Groundbreaking ceremony.

 


3333 North Tenth Street. Marion, IA 52302-5499
Phone 319.447.3000  
Contact Us

©Copyright 2010 Linn-Mar Community School District, All Rights Reserved